Summit County, Utah

Excavation in Silver Creek

Silver Creek is horse property and estate lots on the east side of I-80, plus the commercial and industrial ground near the junction. Wind, exposure, and long driveways.

The ground in Silver Creek

Shale, clay, and rock with thin topsoil. Compaction here rewards moisture control, and cut slopes hold better at 3:1 than anything steeper.

Permits and inspections

Summit County Engineering in Coalville handles it. Expect grading permits, driveway approach approvals off county roads, and stormwater control on anything that disturbs real acreage.

What we do in Silver Creek

  • Estate lot site prep and building pads
  • Long driveway and access road construction
  • Barn, arena, and outbuilding pads
  • Utility runs across acreage
  • Drainage, swales, and erosion control

Standards

From the field notes

Three things we know about building in Park City, Summit County and the Wasatch Back.

See all field notes

Contractor Talk

What builders say

Flaska showed up when they said they would, dug the footings to the engineer's tolerance, and the inspector passed everything on the first walk. That almost never happens.

Marcus

General Contractor

Custom home footings, Park City

I've hired a lot of excavation crews. These guys actually understand grade. The pad was flat, compacted, and the framers started the next morning without a single shim.

Derek

Builder

Building pad, Heber City

Mountain lots are a pain. Tight access, rock, weird drainage. They sorted the sequence, kept the site clean, and didn't bury a single utility where it shouldn't be.

Jake

Project Manager

Site prep & utilities, Kamas

The driveway base they put in held through last winter's freeze-thaw without a crack. I stopped worrying about callbacks the day they finished.

Ryan

General Contractor

Driveway & access, Midway

Communication was direct. No ghosting, no surprises on the invoice. If something needed a different approach, they called before they moved dirt.

Tyler

Home Builder

Grading & final landscape prep, Oakley

They backfilled and compacted around our foundation so well the concrete crew commented on it. That's the kind of handoff that keeps a schedule alive.

Sean

Concrete Contractor

Backfill & final grade, Francis

Steep lot, winter window, inspector who doesn't miss. Flaska knew the soil, knew the sequence, and got us to dry-in two days ahead of plan.

Blake

General Contractor

Full site work, Snyderville

I called on a Monday and they were on site Wednesday. The trench was bedded, piped, and backfilled before the plumber even showed up Friday.

Cole

Plumbing Contractor

Utility trenching, Coalville